The FORCE project was assessed under a joint federal – provincial Environmental Assessment (EA) review process, which considered multiple subsea turbine generators, subsea cables connecting the turbines to land-based infrastructure, an onshore transformer substation, and power lines connecting to the local power distribution system.
The following materials were submitted as a part of the EA process.
The project received EA approval on September 15, 2009.