Seabed Video and Photographic Survey ā€” Berth ā€œCā€ and Cable Route

This report contains video images and still photographs of the seabed obtained in 2009 at FORCE's Berth “C”, the first in which a tidal device was deployed (by the NSPI/Open Hydro team on November 12, 2009), and its proposed cable route to shore. The site is one of three locations designated for tidal device installations at the test facility in northern Minas Passage. Surveys encompassing Berth “C” were carried out on February 2, March 10, June 18 and July 2, 2009 and provided input to the site selection process for the turbine deployment.

 

Author: Patrick L. Stewart, M.Sc. Envirosphere Consultants Limited 

This resource is also available as Appendix F in the 2010 Addendum to the FORCE Environmental Assessment.